Removal and Reinstallation of Submersible Bridge at Corinth Canal

Year of Completion

2024

After a collision involving a motor yacht caused structural damage to a submersible bridge at the Corinth Canal, we were assigned to remove, repair, and reinstall the affected structure. The bridge was carefully lifted using a heavy-duty floating crane, transported to our facilities for restoration, and subsequently returned to full operational status at its original location.