Piraeus Cruise Terminal
Place of Works
Year of Completion
2022
Project Category
his technically challenging project was carried out within a fully operational port environment, requiring meticulous planning and phased execution. The scope included seabed excavation, construction of an underwater embankment to provide a stable foundation, and the placement of precast caissons - each weighing approximately 7,200 tons - as core structural elements of the new cruise terminal. All works were completed in strict accordance with project specifications and safety protocols, ensuring structural integrity, operational continuity, and environmental protection.
Scope of Works
- Excavation of Seabed
- Underwater Embankment Construction
- Placement of Precast Caissons (7200 tons/unit)
