Hellenic Petroleum Facilities Jetty Reconstruction

Place of Works

Year of Completion

2024

As EPC contractor, we undertook the full reconstruction of jetty bridge infrastructure, beginning with the development of detailed design studies. Scope of works included the demolition of the existing pier -comprising eight concrete bridges - and the procurement and erection of two temporary steel structures to ensure uninterrupted pipeline operation. The construction phase involved the installation of forty prestressed beams and various reinforced concrete elements, culminating in the full replacement with eight newly built concrete bridges.

Scope of Works

  • Detailed Design Elaboration
  • Demolition of Pier with Eight (8) Concrete Bridges
  • Procurement and Erection of Two (2) Steel Structures for Pipeline’s Temporary Support
  • Procurement and Installation of Forty (40) Prestressed Beams and Various Concrete Structures
  • Procurement and Installation of Eight (8) New Concrete Bridges