The project entailed the construction of a 700-meter jetty supported on steel tubular piles. A total of 99 piles were driven to provide a robust foundation for the structure. Key activities also included the installation of precast concrete elements and the construction of protective revetments to ensure stability and durability against marine conditions.

Scope of Works

•     Construction of 700 m Jetty (Jetty on Piles) 
•    Driving of 99 Steel Tubular Piles (L - 54 m, OD - 1.40 m)
•    Installation of Precast Concrete Elements
•    Revetment Construction