Ain Sokhna Product Hub
Place of Works
Year of Completion
2017
Project Category
Our scope of work for the Oil Jetty in Ain Sokhna included the construction of a 3,500-meter-long jetty founded on tubular steel piles. A total of 211 piles were driven to support the structure. The project also involved in-situ casting with steel reinforcement, the installation of precast concrete elements, and the placement of heavy-duty steel crossheads. The jetty was designed to meet high-performance and durability standards for oil terminal operations.
Scope of Works
- Construction of 3500 m Jetty - on Piles
- Driving of 211 Steel Tubular Piles (L - 72,00 m, OD - 1.40m, incl1:3)
- Installation of Steel Reinf/ment & In-situ Casting
- Installation of Precast Concrete Elements
- Installation of Steel Crossheads